Inspection of Oil Field Tubular Goods
Presenters: Harold J. Schneider & Charles R. Kromer, Tuboscope Company

Despite preventive measures taken during the manufacture of oil field tubular goods some defective lengths are produced. Other lengths become defective as the result of damage occurring during shipment or handling, or because of service conditions to which they are subjected. Failure to detect and properly dispose of these defective lengths before failure occurs has and can become costly and dangerous.

Show More
Price: $7.50
Paper: Inspection of Oil Field Tubular Goods
Paper: Inspection of Oil Field Tubular Goods
Price
$7.50
Installation Operation of Free Type Tandem Dual Zone Hydraulic Pumps
Presenters: Bob G. Murphy, Cities Service Petroleum Company

Illustrates the installation of a free type tandem dual zone hydraulic pump. Presents operation and design of special equipment required.

Show More
Price: $7.50
Paper: Installation Operation of Free Type Tandem Dual Zone Hydraulic Pumps
Paper: Installation Operation of Free Type Tandem Dual Zone Hydraulic Pumps
Price
$7.50
Installation Operation of Submergible Pumps
Presenters: H.H. Schultz, Reda Pump Company

A Reda pump is essentially a multistage centrifugal pump, the shaft of which is directly connected through a protector section to a submergible electric motor. The entire assembly, as a unit, is of such outside diameter that it can be installed in wells completed with standard size casing. In operating position, the unit is suspended on tubing, submerged in the well fluid, with a cable from the surface supplying electricity to the motor. The installation may be for any depth since the unit is designed to function under any submergence pressures encountered.

Show More
Price: $7.50
Paper: Installation Operation of Submergible Pumps
Paper: Installation Operation of Submergible Pumps
Price
$7.50
Installation and Care of Beam Pumping Units
Presenters: Fred Griffin, Lufkin Foundry & Machine Company

When it becomes necessary to put an oil well on the pump, the operator is usually faced with an investment of several thousand dollars in some means of artificial lift. By far the most successful and most generally accepted type of artificial lift is the beam type pumping unit. Many years of research and testing have gone into the design of the modern pumping unit. Advancements in metallurgy and the most up-to-date machine tools go into its manufacture. All these improvements in design and technique of manufacture are of little value in the equipment is not installed properly on the well or operated correctly. For the operator to get the most from his investment in a pumping unit, he should operate the unit as the manufacturer intended it to be used and within its nameplate rating.

Show More
Price: $7.50
Paper: Installation and Care of Beam Pumping Units
Paper: Installation and Care of Beam Pumping Units
Price
$7.50
Installation And Maintenance Of Field Gas Compressors
Presenters: Gerald A. Grace, Cooper Penjax

In today's times of material shortages and spiraling material costs, it has become increasingly important to emphasize proper installation techniques and a comprehensive maintenance program to assure long equipment life with minimum maintenance. Of prime consideration will be a scheduled maintenance program to prevent untimely and expensive downtime, and to prevent expensive major maintenance.

Show More
Price: $7.50
Paper: Installation And Maintenance Of Field Gas Compressors
Paper: Installation And Maintenance Of Field Gas Compressors
Price
$7.50
Installation and Operation of Pilot Controlled Gas-Lift Valves in Multiple Completion Wells
Presenters: Bob Walton, Odex Engineering Co.

The purpose of this paper is to show how the design and operation of pilot-controlled gas-lift valves have overcome many of the inherent problems of multiple completions. Within the production tubing string, multiple completed wells are no different than single completions. From a gas-lift standpoint, the main difference is that several wells producing from a common casing, have a common casing annulus gas supply. This fact eliminates the use of pressure in the annulus as the sole means for actuating the gas-lift valves.

Show More
Price: $7.50
Paper: Installation and Operation of Pilot Controlled Gas-Lift Valves in Multiple Completion Wells
Paper: Installation and Operation of Pilot Controlled Gas-Lift Valves in Multiple Completion Wells
Price
$7.50
Installation Considerations For Dual Triple Zone Pumping
Presenters: Forrest W. Goin & Dean E. Hermanson, Axelson Division of U.S. Industries, Inc.

In general, the well characteristics will govern the type of pumping completion and the selection of equipment. Various arrangements of equipment are discussed, such as two packer single string, single packer with either clipped or free running secondary string, hollow rod pumping, lower zone gas venting and triple completions. It is emphasized that attention to correct installation of all equipment will eliminate needless completion expense.

Show More
Price: $7.50
Paper: Installation Considerations For Dual Triple Zone Pumping
Paper: Installation Considerations For Dual Triple Zone Pumping
Price
$7.50
Installing high Density Polyethylene (HDPE) Liners In Existing Water Injection Lines
Presenters: A.S. Faggard, Chevron U.S.A. Inc.

This paper will discuss the installation of High Density Polyethylene (HDPE) liners in existing cement-lined and bare steel water injection pipelines. Design criteria, economic evaluation, and HDPE liner installation details are included. Also, different types of HDPE liner systems, material properties, and internal corrosion protection will be discussed.

Show More
Price: $7.50
Paper: Installing high Density Polyethylene (HDPE) Liners In Existing Water Injection Lines
Paper: Installing high Density Polyethylene (HDPE) Liners In Existing Water Injection Lines
Price
$7.50
Instrument Skid Flexibility Improves Frac Job Data Acquisition
Presenters: Don Shackelford, Halliburton Services

An instrument skid especially designed for fracturing data acquisition provides operator flexibility and choices that can help reduce costs of data acquisition and recording. The operator interface panel (OIP) associated with the skid can be viewed at the skid or can be remoted up to 250 ft distance from the skid. Information collected can be used by the on-board computer system and displayed on three screens of the OIP, or the digitized data can be communicated to other computer systems that may be on the job.

Show More
Price: $7.50
Paper: Instrument Skid Flexibility Improves Frac Job Data Acquisition
Paper: Instrument Skid Flexibility Improves Frac Job Data Acquisition
Price
$7.50
Integrated Nitrogen Rejection Facility Produces Fuel and Recovers NGLs
Presenters: S.K. Looney, B.C. Price, & C.A. Wilson, ARCO Oil & Gas Co.

Shortly after the discovery of the Block 31 field in 1945, ARC0 Oil and Gas Company, then Atlantic Refining Company, started searching for ways to improve the ultimate recovery from the Devonian formation. Laboratory research showed that natural gas would become miscible with the crude at 3500 psi. Therefore, injection of the produced gas began in 1949. A processing plant was built in 1957 to extract liquids from the gas before reinjection. Eventually, the produced gas volume was not adequate to maintain miscibility pressure and additional gas was purchased to make up reservoir voidage. Further laboratory research showed that flue gas injection would maintain miscibility at a higher injection pressure. ARC0 began flue gas injection in the Block 31 field in 1966 at a rate of 40 to 50 MMSCFD. In 1980, a favorable decision was handed down from the U.S. Department of Energy relative to the recoupment of investments made in tertiary recovery projects. This provided further incentive for an ongoing development program. Since 1966, continuous flue gas injection has sustained the miscible flood and, being predominantly nitrogen, caused a constant increase in nitrogen content of the produced gas. The inlet gas to the processing plant currently contains from 30 to 45% nitrogen. The processing plant consists of three lean oil absorption trains for propane and heavier recovery. Residue gas from the processing plant, which is used for fuel, has declined in BTU content to below 800 BTU/SCF. All the fuel users were designed for 950-1000 BTU fuel. The fuel had to be "spiked" with a high ethane stream to maintain a 950 BTU fuel stream. This blending was satisfactory for several years, but variations in nitrogen content and momentary imbalances in this blending cause operational problems in the gas-engines, power boilers, and flue gas generators. Three alternatives were evaluated for solving the fuel problem: purchasing outside fuel, retrofitting existing equipment for low BTU fuel or building a nitrogen rejection facility. Nitrogen rejection was determined to be the preferred solution from an economic and reliability standpoint. The nitrogen rejection facility (NRF), built in 1983, handles 94 MMSCFD of the highest BTU (lowest N,) gas. This facility was designed to produce up to 38 MMSCFD of fuel gas while recovering 300,000 gal/day of NGL's.

Show More
Price: $7.50
Paper: Integrated Nitrogen Rejection Facility Produces Fuel and Recovers NGLs
Paper: Integrated Nitrogen Rejection Facility Produces Fuel and Recovers NGLs
Price
$7.50
Intelligent ESP Controller
Presenters: Mark Barnes, Ken Booth, Bob Coltharp, & Mark Garrett, eProductions Solutions

The use of an intelligent ESP control unit (IESP) aids in remotely operated and "trouble" wells. Inputs from a number of end devices are used to determine the condition of the well bore and the equipment. Based on these inputs the mode of start-up or operation is "decided on" by the IESP. Control commands are then sent to the Variable Frequency Drive (VFD), switchboard controller, or back-pressure valve to achieve the desired mode of operation. This paper will discuss the concept and IESP design behind the initial project.

Show More
Price: $7.50
Paper: Intelligent ESP Controller
Paper: Intelligent ESP Controller
Price
$7.50
Intelligent ESP System Being Tested in PDO
Presenters: Cleon Dunham, Oilfield Automation Consulting, & Shaikhan Al Khadhori & Abdullah Al Harthy, Petroleum Development Oman

Petroleum Development Oman (PDO), working in close cooperation with several other companies, is developing and testing a remote, automatic, intelligent ESP system for Oman's challenging operations. This progress report describes the system concepts, expected benefits, and current status. PDO operates nearly 600 ESPs; this number is continuously growing. Many are located in very remote areas; many produce from sandy formations; many produce significant amounts of gas; most use fixed speed drives. These wells must be carefully started and operated to avoid damage from sand, inefficiency from gas, and safe and effective operation within the normal pump envelope. Currently, this is very labor intensive. Due to remote locations, it often results in excessive, hazardous desert driving, inefficient use of manpower, significant production deferment, and excessive operating costs. To optimize these wells, PDO is developing a system that includes downhole instrumentation to measure pump pressures and other key variables, a real-time sand production monitor, an automatic well-head control valve (for wells with fixed speed drives), and a full production automation (SCADA) system. The wells must be started and/or restarted slowly to avoid sand production problems or gas interference. Production must be ramped slowly enough to avoid these problems, but rapidly enough to avoid down-thrust or excessive motor heating. ESP Technicians are able to interact with the system from the field or corporate offices to optimize operational parameters and troubleshoot faults and shutdowns. Major benefits are expected to be up to 80% reduction in desert driving, significant improvements in production and equipment life, major reductions in deferment and ESP operating costs, and wider application of ESPs in preference to beam pumps and gas-lift. Initial field tests are underway in the Wafra Field in PDO. Implementation on more wells in PDO is anticipated when the field tests are successfully completed in early 2003.

Show More
Price: $7.50
Paper: Intelligent ESP System Being Tested in PDO
Paper: Intelligent ESP System Being Tested in PDO
Price
$7.50
Intelligent Treatment Of Waxy Crude Oils
Presenters: Harold Becker, BJ Unichem Chemical Services

Waxes accumulate as obstructions to the normal flow of crude oil systems. They do this by attracting molecules of like character (e.g., normal paraffin hydrocarbons) and combining through intermolecular forces to form aggregates of a crystalline nature. The aggregates thus formed interact mechanically and accumulate in constricted flow regions, pipe surfaces, and quiescent storage areas. Once it has been determined that paraffin wax accumulation has restricted the normal production, transport, and/or storage of crude oil, measures should be quickly undertaken to remedy the problem. Several remediation methods are available including, hot oiling, hot watering, combination hot water and surfactants, solvent, solvent/surfactant treatments, magnets, bacterial treatments, and crystal modifiers etc.. . Each method possesses strengths and weaknesses. Hot oiling and hot watering are known to be useful in helping to dislodge pumps that are bound up by wax, but their continued practice has also been shown to concentrate higher melting wax fractions in existing deposits thereby making the remaining deposit more difficult to melt in subsequent treatments. Solvent and solvent/ surfactant treatments are excellent means of wax deposit removal, but the extent of their wax carrying ability is limited by temperatures below the cloud point of wadsolvent combination. Crystal modifiers provide the most effective means of preventing deposits, and will in combination with solvents, or hot oil provide significant deposit removal, but they tend to be costly. The successful treatment of paraffin wax accumulations is largely dependent upon the proper identification and characterization of their chemical composition and their physical behavior under various environmental conditions.

Show More
Price: $7.50
Paper: Intelligent Treatment Of Waxy Crude Oils
Paper: Intelligent Treatment Of Waxy Crude Oils
Price
$7.50
INTERACTIONS BETWEEN FRACTURING FLUID ADDITIVES AND CURRENTLY USED ENZYME BREAKERS
Presenters: Bethicia B. Prasek, BJ Services Company

Advances in enzyme technology and its application to hydraulic fracturing have brought enzyme breakers from low-temperature, low-pH applications to being used over a wide range of temperatures, pH's and fluid systems. Their potential as fracturing fluid breakers seems almost limitless as one obstacle after another has been swept away by advances in biotechnology. High-temperature enzymes, high-pH enzymes and controlled release enzymes have contributed to their widespread use as fracturing fluid breakers. Advantages of enzyme breakers over conventional oxidative breakers has been well documented. For example, oxidative breakers have many limitations including interferences and incompatibilities with other fracturing fluid additives. Enzyme breakers, too, have limitations including interferences and incompatibilities with other additives. Ignorance of these interactions can have dramatic effects on the success of a hydraulic fracturing job. With the new advances in enzyme applications, it is not always easy to keep abreast of the limitations of the new enzyme breakers. Interactions known for other enzymes are often just assumed to apply to new enzyme breakers. This is not always the case. Use of enzyme breakers under more extreme pH and temperature conditions can also cause or magnify interactions. This paper covers interactions between currently used enzyme breakers and fracturing fluid additives including biocides, clay stabilizers, and certain types of resin-coated proppants.

Show More
Price: $7.50
Paper: INTERACTIONS BETWEEN FRACTURING FLUID ADDITIVES AND CURRENTLY USED ENZYME BREAKERS
Paper: INTERACTIONS BETWEEN FRACTURING FLUID ADDITIVES AND CURRENTLY USED ENZYME BREAKERS
Price
$7.50
Intermittent Gas Lift
Presenters: Kermit F. Brown, University of Texas

In most instances there will be no question as to whether or not a well should be placed on continuous flow or intermittent flow. However, there are cases of the so called "borderline well". Reference should be made to "The Power of Gas" by Mr. C.V. Kirkpatrick for a complete analysis of the borderline well. This procedure involves an analysis of injection pressure injection gas/oil ratio and horsepower requirements. The following types of intermittent flow installations utilized in the field today are: 1. Tubing flow with a packer only (semi-closed installation), Fig. 1; 2. tubing flow with a packer and a standing valve (closed installation), Fig. 2;, 3. Tubing flow from a chamber (closed installation), Fig 3; 4. Any one of the three preceding installations in combination with a "piston" or "plunger", Fig 4.

Show More
Price: $7.50
Paper: Intermittent Gas Lift
Paper: Intermittent Gas Lift
Price
$7.50
Intermittent Gas Lift Design Utilizing Multipoint Gas Injection
Presenters: H.W. Winkler, Camco, Inc.

The purpose of this paper is to describe multipoint intermittent gas lift installation design. The application and advantages of this design technique are noted. The operating principal of multipoint gas injection, which includes fundamental valve mechanics, is presented. The maximum producing rates from the same high capacity well with a continuous flow installation and a multipoint intermittent installation are compared, and the reasons for the difference in producing capacity is reviewed.

Show More
Price: $7.50
Paper: Intermittent Gas Lift Design Utilizing Multipoint Gas Injection
Paper: Intermittent Gas Lift Design Utilizing Multipoint Gas Injection
Price
$7.50
Intermittent Gas Lift, Plunger-Lift Assisted
Presenters: Stanley J. Morrow, Ferguson Beauregard/Logic Controls

Many of the thousands of wells produced by intermittent gas-lift experience similar problems. One problem is that the system is attempting to lift a static slug from the bottom of the well to the surface, which is quite inefficient. As the slug moves toward the surface, there is a frictional drag on the liquid slug along the inner walls of the tubing. That drag, coupled with the fact that the gas is travelling faster than the liquid, means that there is a tendency for the gas to outrun the liquid. The liquid that is outrun never reaches the surface, it falls back to the bottom of the well. By creating a fluid column in the bottom of the well, this "fallback" increases the back pressure on the formation, thereby reducing the effective average flowing bottom hole pressure. The net result is less production. Another common problem experienced in intermittent gas-lift is over-injection. In some operations the injection gas is intentionally over injected to help "sweep" out the falling liquid. While this could help, it is highly inefficient. On wells where the injection gas is controlled by a choke or orifice, over injecting in nearly impossible to avoid. Over injecting also keeps the tubing pressure of the well higher for a longer period of time. This has a negative effect on the flowing bottom hole pressure, and on liquid production. This report will address these common problems, and offer a sensible solution to both. The applications for this system are widespread, but cannot be automatically applied to every gas-lift well. As with all other artificial lift systems, each well must be studied individually to determine it's suitability. Plunger-lift offers the producer options, but cannot be viewed as a cure-all.

Show More
Price: $7.50
Paper: Intermittent Gas Lift, Plunger-Lift Assisted
Paper: Intermittent Gas Lift, Plunger-Lift Assisted
Price
$7.50
Internal Cement Lining for Tubular Goods
Presenters: J.F. Armstrong, Permian Enterprises, Inc.

Cement-lined steel or iron pipe is not a new approach to corrosion prevention. In 1836 the French Academy of Science reported the successful use of cement-lined pipe. They reported that, "Hydraulic cement, applied about 2.5 mm (0.1 inches) thick, is of all compositions, combining facility of application and cheapness, that which adheres the best to the casting, is the most indestructible, and prevents most effectually all oxidation (Corrosion) and consequent formation of tubercles. Of course, it is well documented that the great Roman aqueducts were constructed of hydraulic cement, forerunner of modern Portland cement.

Show More
Price: $7.50
Paper: Internal Cement Lining for Tubular Goods
Paper: Internal Cement Lining for Tubular Goods
Price
$7.50
Internal Coatings for Tubular Goods
Presenters: Jack L. Ward, Plastic Applicators, Inc.

The use of internal protective coatings for oilfield pipe has greatly increased during the past few years. New coating systems and application techniques, quality control, engineered performance and successful field use have all contributed to this growth. This paper summarizes the history of the coating industry, surveys the present art, and defines the useful areas for coatings in oil and gas production.

Show More
Price: $7.50
Paper: Internal Coatings for Tubular Goods
Paper: Internal Coatings for Tubular Goods
Price
$7.50
Internal Corrosion Inhibition of Gas Gathering Lines
Presenters: H.H. Fischer, Baroid Division, National Lead Company

Accelerated internal failures of gas gathering lines due to corrosion are creating more concern to operators. A review of the dissolved gasses which cause corrosion is significant from the standpoint of occurrence and prediction of corrosion. Dissolved oxygen when present with other corrosive gases causes severe corrosion. Experience shows that early detection of corrosion by the use of monitoring devices is essential. Corrosion in gas gathering lines can be effectively and economically inhibited with organic film forming amine corrosion inhibitors properly applied and monitored.

Show More
Price: $7.50
Paper: Internal Corrosion Inhibition of Gas Gathering Lines
Paper: Internal Corrosion Inhibition of Gas Gathering Lines
Price
$7.50
Internet-Based Permitting Of Oil And Gas Wells At The Texas Railroad Commission
Presenters: Susan L. Cisco, Railroad Commission of Texas

Paper may soon be eliminated from the well permitting process at the Railroad Commission of Texas ("Commission") by an electronic commerce system that captures, stores, and transmits oil or gas well permitting information. With a few computer keystrokes and mouse clicks, Burlington Resources filed and the Commission approved the first drilling permit electronically through the ECAP (Electronic Compliance and Approval Process) system in a demonstration on May 11, 2000. A collaboration among the U. S. Department of Energy, the oil and gas industry, and the Commission, ECAP is expected to save more than $17 million annually, improve communication, and streamline regulatory processes through the use of Internet-based technologies, relational databases, document imaging, and workflow software.

Show More
Price: $7.50
Paper: Internet-Based Permitting Of Oil And Gas Wells At The Texas Railroad Commission
Paper: Internet-Based Permitting Of Oil And Gas Wells At The Texas Railroad Commission
Price
$7.50
Intrinsically Safe Fluid Level Instrument for Hazardous Environments
Presenters: Jim McCoy and Dieter Becker, Echometer Company; Jerry West, Jerry West LLC A. Podio, University of Texas

Stringent safety requirements imposed by major operators when fluid level measurements are performed offshore or in enclosed wellhead spaces such as in Alaska's North Slope create procedural complications, such as the requirement for hot permits, when performing fluid level measurements in producing wells. This need has been eliminated by the development of a small, self contained, fully digital, battery powered instrument that is approved for use in hazardous areas. The Echometer Model H electronics has been tested at various locations on the North Slope. It facilitates the acquisition and interpretation of the data through an advanced software package that virtually automates the analysis even in acoustically noisy environments. Results are observed immediately on the instrument screen then saved in the data base for eventual transfer to corporate records. This paper presents detailed information about the new system and reviews data acquired in gas lift wells, flowing gas wells and ESP installations

Show More
Price: $7.50
Paper: Intrinsically Safe Fluid Level Instrument for Hazardous Environments
Paper: Intrinsically Safe Fluid Level Instrument for Hazardous Environments
Price
$7.50
INTRINSICALLY SAFE WELL ANALYSIS INSTRUMENTS
Presenters: Jim McCoy and Bill Drake, Echometer Company, A.L. Podio, University of Texas at Austin

Safety in the workplace is one of the major considerations for selecting and applying instruments for use in conjunction with oil and gas operations. All companies, government and labor organizations have developed guidelines and regulations aimed at making the workplace as safe as possible. In particular, instruments that are used in a hazardous environment have to meet strict requirements and specifications and be certified for use in explosive atmospheres. API has developed guidelines that define the level of hazard in relation to oil and gas production locations where explosive gases are present. It is important that the user of certified instruments understand the meaning of certification of an intrinsically safe system, the process that the manufacturer must follow to obtain certification and the requirements and procedures that must be adhered to in order to achieve the required level of safety when installing and using the equipment. This paper presents the fundamental aspects of intrinsic safety certification with respect to fluid level instruments used in analyzing the performance of wells during drilling, production and workover operations.

Show More
Price: $7.50
Paper: INTRINSICALLY SAFE WELL ANALYSIS INSTRUMENTS
Paper: INTRINSICALLY SAFE WELL ANALYSIS INSTRUMENTS
Price
$7.50
INTRODUCTION TO AUTOMATED ROTARY SELECTOR VALVE (RSV), SPILL PREVENTION CONTAINMENT SKID and OPTIONAL (MPFM) MULTI PHASE FLOW METER
Presenters: Al Burns; Oil States Industries

This paper will provide a basic understanding of the Multiport Selector Valve (MSV) also known as Rotary Selector Valve (RSV), Controller, Environmentally-Friendly Spill Prevention Skid, Design Analysis, Usage and Dynamic Fundamentals; Highlighting the technical capabilities to manifold multiple wells from a single unit. Automation

Show More
Price: $7.50
Paper: INTRODUCTION TO AUTOMATED ROTARY SELECTOR VALVE (RSV), SPILL PREVENTION CONTAINMENT SKID and OPTIONAL (MPFM) MULTI PHASE FLOW METER
Paper: INTRODUCTION TO AUTOMATED ROTARY SELECTOR VALVE (RSV), SPILL PREVENTION CONTAINMENT SKID and OPTIONAL (MPFM) MULTI PHASE FLOW METER
Price
$7.50
Introduction To Plunger Lift Applications, Advantages Limitations
Presenters: E. Beauregard & Paul Ferguson, Ferguson Beauregard Inc.

This paper discusses the principle of plunger lift and it's possible applications. Typical applications are: 1. Removal of Liquids from Gas Wells 2. Hi-Ratio Oil Well Production 3. Paraffin and Hydrate Control 4. Increased Efficiency of Intermittent Gas Lift Wells Some advantages of this system are low initial cost, very little maintenance and that there is no external source of energy required in most cases. Limitations such as mechanical conditions, gas and liquid volumes and depths are also discussed. There will be a brief section concerning the various types of equipment available.

Show More
Price: $7.50
Paper: Introduction To Plunger Lift Applications, Advantages Limitations
Paper: Introduction To Plunger Lift Applications, Advantages Limitations
Price
$7.50

Annual Conference Info

NEXT CONFERENCE: APRIL 21-24, 2025