Comparison of Steel Sucker Rod and FiberglassSteel Sucker Rod String Performance
Presenters: Elton J. Smith, Pioneer Natural Resources, Inc., T.P. Hopper, Fibercom, Inc., Kass Copelin, Texas Tech University

Usage of fiberglass sucker rods have proven to be the most efficient means of producing artificial lift wells in the Pioneer Natural Resources, Spraberry Trend Area. Fiberglass/steel designs are being installed on all new drilled wells and will remain in place for the life of the well. In this paper examples will be given of production improvements when going from an all steel to a fiberglass/steel design, various designs which decrease string weight 13 to 26%, benefits of the lighter more elastic rod and comparison of failure data. Procedures used by Pioneer will be discussed to assist operators in selecting the best design for different well characteristics.

Show More
Price: $7.50
Paper: Comparison of Steel Sucker Rod and FiberglassSteel Sucker Rod String Performance
Paper: Comparison of Steel Sucker Rod and FiberglassSteel Sucker Rod String Performance
Price
$7.50
Compatibility of Curable Resin-Coated Proppant with Breakers in Crosslinked Fracturing Fluids
Presenters: David A. Stiles, Dowell Schlumberger

Curable resin-coated proppant (RCF") is used in hydraulic fracturing treatments primarily as a means of preventing or reducing proppant flowback during post-frac clean-up and production. The RCP is generally placed in the fracture with water based crosslinked fluids. In order to effectively remove these viscous fluids which are detrimental to fracture conductivity from the proppant pack, it is necessary for a reduction in the fluid's viscosity to occur. This reduction in viscosity, or breaking, may occur either (1) thermally (2) with the addition of enzyme breakers! or (3) with the addition of oxidizing breakers, depending on the fluid used and the bottom hole temperature of the well. Laboratory studies to determine the effects of various commercially available curable RCP's on breaking of commonly used fracturing fluids are presented in this paper. Fluids studied include linear, as well as borate and transition metal crosslinked guar and hydroxypropyl guar. The chemical breakers studied include an enzyme, an oxidizer and an oxidizer used in conjunction with a free radical initiator. Additionally, the effects of these various chemical breakers on the compressive strength development of the consolidated proppant pack is investigated.

Show More
Price: $7.50
Paper: Compatibility of Curable Resin-Coated Proppant with Breakers in Crosslinked Fracturing Fluids
Paper: Compatibility of Curable Resin-Coated Proppant with Breakers in Crosslinked Fracturing Fluids
Price
$7.50
Compatibility of Curable Resin-Coated Proppants with Breakers in Crosslinked Fracturing Fluids
Presenters: David Stiles, Dowell Schlumberger

Curable resin-coated proppant (RCF") is used in hydraulic fracturing treatments primarily as a means of preventing or reducing proppant flowback during post-frac clean-up and production. The RCP is generally placed in the fracture with water based crosslinked fluids. In order to effectively remove these viscous fluids which are detrimental to fracture conductivity from the proppant pack, it is necessary for a reduction in the fluid's viscosity to occur. This reduction in viscosity, or breaking, may occur either (1) thermally (2) with the addition of enzyme breakers! or (3) with the addition of oxidizing breakers, depending on the fluid used and the bottom hole temperature of the well. Laboratory studies to determine the effects of various commercially available curable RCP's on breaking of commonly used fracturing fluids are presented in this paper. Fluids studied include linear, as well as borate and transition metal crosslinked guar and hydroxypropyl guar. The chemical breakers studied include an enzyme, an oxidizer. and an oxidizer used in conjunction with a free radical initiator. Additionally, the effects of these various chemical breakers on the compressive strength development of the consolidated proppant pack is investigated.

Show More
Price: $7.50
Paper: Compatibility of Curable Resin-Coated Proppants with Breakers in Crosslinked Fracturing Fluids
Paper: Compatibility of Curable Resin-Coated Proppants with Breakers in Crosslinked Fracturing Fluids
Price
$7.50
Completion Stimulation Programs In The Spraberry Trend of West Texas
Presenters: Bill Bucy & Bill Halepeska, The Western Company

Increased demand for crude oil and the higher prices being paid for petroleum products have caused a resurgence of activity in the Spraberry Trend of West Texas, (Fig. 1). Even though it is one of the largest producing areas in the industry it has always been somewhat of an enigma to those working with it. However, with proper planning and execution of the completion phase, new wells in the Spraberry-Dean sections, and re-. completions in the Dean zone can be economically attractive. The Spraberry and Dean zones are primarily siltstones with very low matrix permeability and porosity. Extensive natural fractures occur throughout the zones. It is the existence of these fractures that provides enough fluid movement and fluid storage to make completion from the zones economically feasible. Due to the nature of these formations, they require a successful hydraulic fracture treatment to provide the needed productivity. Two very influential factors to be considered in planning the stimulation treatment are: zone separation and fluid selection. In order to properly stimulate each zone, it is necessary to keep them separate during the stimulation process. The existence of natural fractures favors extension of the induced fractures beyond the vertical limits of the perforated intervals. In addition, there is a significant difference in the fracturing pressures of the zones, thereby creating a pressure differential across any unperforated interval. It is general practice to maximize the length of this unperforated zone of separation. One popular method for staging the subsequent stimulation treatment is the "ring and bomb" procedure; another is to take advantage of this natural pressure difference between the Dean and Lower Spraberry zones to effect sequential stimulation without benefit of mechanical separation. When stimulating formations with low permeabilities it is necessary to create deeply penetrating fractures in order to obtain adequate drainage. In the case of the specific formations under consideration, large induced fracture heights occur regularly. The end result is the creation of very large fracture areas requiring large quantities of frac fluids. Therefore, it is very important that the fluid chosen provides a balance of fluid efficiency, cost, characteristics. and clean-up Production data on a well-to-well basis is erratic; however, studies of selected groups of wells lead to the general conclusion that bigger frac jobs provide for more ultimate oil recovery. This return on investment is an exponential function and experimentation is still being conducted in an attempt to better define the optimum limits. In addition to fracture penetration, the sand program used and the fracture widths created seem to also have an effect on the production history.

Show More
Price: $7.50
Paper: Completion Stimulation Programs In The Spraberry Trend of West Texas
Paper: Completion Stimulation Programs In The Spraberry Trend of West Texas
Price
$7.50
COMPREHENSIVE STUDIES ON THE FACTORS AFFECTING SUCKER ROD-COUPLING MAKE-UP
Presenters: Erik Tietz and Arun Sriraman UPCO, Inc.

Beam pumping systems are operated in challenging and hostile environments due to the ever increasing demand to produce oil in a fast and efficient manner. The goal of this project is to increase the efficiency of these beam pumping systems by studying and optimizing some of the critical factors affecting sucker rod

Show More
Price: $7.50
Paper: COMPREHENSIVE STUDIES ON THE FACTORS AFFECTING SUCKER ROD-COUPLING MAKE-UP
Paper: COMPREHENSIVE STUDIES ON THE FACTORS AFFECTING SUCKER ROD-COUPLING MAKE-UP
Price
$7.50
COMPREHENSIVE STUDIES ON THE FACTORS AFFECTING SUCKER-ROD COUPLING MAKE UP
Presenters: Erik Tietz and Arun Sriraman, UPCO, Inc.

Beam pumping systems are operated in challenging and hostile environments due to the ever increasing demand to produce oil. Marketing research revealed the fact that 70% of failures in this industry were rod pin failures. An in-house research & development project/experiment was conducted to address some of the critical factors governing rod pin failures. The experiment uses core engineering concepts of stress, strain, torque and circumferential displacement and explicitly answers the following questions. A) How does the current displacement values affect rod-coupling make up and are they accurate? B) What is the best type of lubrication technique (dry or wet face make up) for the application of rod-coupling make up and why? C) What is the life of a sucker rod or what is the optimal number of make ups on a sucker rod?

Show More
Price: $7.50
Paper: COMPREHENSIVE STUDIES ON THE FACTORS AFFECTING SUCKER-ROD COUPLING MAKE UP
Paper: COMPREHENSIVE STUDIES ON THE FACTORS AFFECTING SUCKER-ROD COUPLING MAKE UP
Price
$7.50
COMPRESSING CASING HEAD GAS USING GREEN TECHNOLOGY
Presenters: Charlie McCoy, Permian Production Equipment, Inc.

The Beam Pumping System, in onshore oil wells, is a major part of the artificial lift method. Utilizing the energy from the Pumping Unit, to operate, the BGC lowers the cost of compression and eliminates the emissions created by other compression systems. By utilizing the Pumping Unit as the BGC's prime mover, operators enjoy a steady increase in production with a "tried and true" compression system that is considered a GREEN MACHINE by the industry. The Walking Beam Compression System gives greater oil and/or gas production and at the same time consumes less energy than conventional compression systems without greenhouse gas emissions.

Show More
Price: $7.50
Paper: COMPRESSING CASING HEAD GAS USING GREEN TECHNOLOGY
Paper: COMPRESSING CASING HEAD GAS USING GREEN TECHNOLOGY
Price
$7.50
Compressor-Gas Lift System for Individual Wells
Presenters: William P. Massey, Camco Gas Lift Co., Inc.

A discussion of the mechanics involved in gas lifting individual wells with a small rotary-compressor system. Technique, applications, and advantages are presented. Example installations and their costs are included.

Show More
Price: $7.50
Paper: Compressor-Gas Lift System for Individual Wells
Paper: Compressor-Gas Lift System for Individual Wells
Price
$7.50
Computer Application In Sucker Rod Pumping Management
Presenters: J.R. White, Exxon Company USA

In the geographical areas of North and West Texas, 94 percent of all oil wells produce by means of artificial lift, and most of the artificial lift installations consist of sucker rod pumping equipment. This percentage equates to some 100,000 rod pumping units in this area alone." With these facts in mind, there should be no doubt as to why the proper management and surveillance of pumping equipment are important. This paper is limited to a discussion of computer application in the management and surveillance of rod pumping equipment. When terms referring to artificial lift equipment are used in the paper, they are in specific reference to sucker rod pumping installations. Methods and techniques cited for the surveillance and analysis of sucker rod pumping installations are from those employed in Exxon Company, U.S.A.

Show More
Price: $7.50
Paper: Computer Application In Sucker Rod Pumping Management
Paper: Computer Application In Sucker Rod Pumping Management
Price
$7.50
Computer Logs In Decision Making
Presenters: John Kowalski, Dresser Atlas

Forty years ago there was little problem with the analysis of a well log. The only type of log that was available was an Electrolog. This survey was used to determine the depth of the pay zone, the thickness of the bed, and the location of the oil-water contact. As time went on, more and more different types of logs were developed and the analysis of each was fairly simple and straightforward. However, a problem was developing in the interpretation of wells. What could be done on a well which was logged with two, or three, or four different tools? Each tool required a different method of analysis because of the different theories and types of data that were being measured. Log analysis was rapidly developing into a highly specialized discipline. At the present time, one of the most important people in any oil company is the log analyst. The exploration people depend on him for information about the rocks in a wildcat and the exploitation group depends on him to tell them about the reservoir characteristics. Now, instead of one or two types of logs, he has to contend with about forty of them. Each of these logs responds differently in a sequence of different lithologies. Because of this distinctive response, certain combinations of logs may be used to determine characteristics of the rock through which they are recorded. In most cases, these logs are recorded as a line trace on film in a camera (Fig. 1). There are, however, certain specialized logs which are recorded on special equipment to facilitate their interpretation (Fig. 2). The modern log analyst uses all methods of interpretation that are available to him, from simple charts to computers. In today's oil field most wells are high cost, high risk ventures. A single zone can make the difference between putting a well on production and abandoning it. The responsibility of deciding on the location and quality of pay zones places such a burden on the log analyst that he cannot afford to leave anything to chance. The advent of computers has given him a tool which he can depend on giving a total uniform analysis of any section. At the present time there are many different types of programs, a great many of which are highly specialized. However, there are six programs which are in widespread usage - Shaly-Sand, Complex (carbonates), Elastic Properties, Coal, Diplog and Cased Hole Analyses. Each of these computer programs requires certain input data to calculate all of the output information. After the data has been converted to magnetic tape it is plotted on a graph-like chart. Because of the characteristics of the logs, distinctive patterns, which depend on the rock, are formed in these cross plots (Fig. 3). The log analyst then uses these cross plots to determine parameters for the computed log.

Show More
Price: $7.50
Paper: Computer Logs In Decision Making
Paper: Computer Logs In Decision Making
Price
$7.50
Computer Pump-off Control of Sucker-Rod Pumped Well Denver Unit, Wasson Field Gaines Yoakum Counties, Texas
Presenters: A.B. Neely, Shell Oil Company

The Shell-operated Denver Unit of the Wasson Field consists of approximately 850 producing wells. Over 700 of these are being produced by sucker-rod pump. Average production is about 400 BFPD with an average water cut of 60 percent. Surveillance of the rod-pumped wells is being achieved with a computer-based pump-off control. Initial benefits of 4 percent increase in production and an I8 percent savings in electrical energy are being achieved. Other operational benefits which are realized are described.

Show More
Price: $7.50
Paper: Computer Pump-off Control of Sucker-Rod Pumped Well Denver Unit, Wasson Field Gaines Yoakum Counties, Texas
Paper: Computer Pump-off Control of Sucker-Rod Pumped Well Denver Unit, Wasson Field Gaines Yoakum Counties, Texas
Price
$7.50
Computer Simulation of Rod Pumping Wells
Presenters: L. Douglas Patton, Corod, Inc.; Frank M. Pool, JR., Media Systems, Inc.

The use of simulation in petroleum engineering is not new; pipeline and refinery simulation and simulation of reservoir performance have been widely used in the past. However, in recent years there have been major improvements in the ability to simulate rod pumping situations, such as the use of mathematical expressions and equations (derived from API RP 1lL) to capture succinctly complex interrelationships which heretofore could not be easily related. The model is then manipulated on the computer to see what might happen in reality if the relationships were fixed or varied in specific ways. Because every system is in some state of dynamic adaptation to its environment (everything outside the system boundaries that has some influence on the system), there will always be problems to be solved. This is where the use of an abstract system simulation model proves advantageous. Simulation is just a numerical method used as a means of finding successive states of a situation or system by repeatedly applying the rules by which the system is operated

Show More
Price: $7.50
Paper: Computer Simulation of Rod Pumping Wells
Paper: Computer Simulation of Rod Pumping Wells
Price
$7.50
Computer-Aided Studies of Rod Pumping System Performance
Presenters: S.G. Gibbs, Nabla Corp.

Although it looks simple, rod pumping equipment requires complex simulation methods to mimic the variety of actual conditions encountered in the field. This paper describes such a method which relates the influence of unit geometry, prime mover slip, rod design and downhole pump condition. The method is mathematical, but non-technical means such as dynamometer cards and electrical terms are used to describe it. The intent of the paper is to study a variety of practical rod pumping questions that frequently arise. It has been found that the computer aided simulation has suggested performance phenomena not widely known or understood. Portions of the subject method have been under development for twenty years. Some of the theoretical details are shown in Reference 1. Recent additions to the technology have been in handling the effects of inertia on gearbox and prime mover loading (Ref. 4). Most recent has been simulation of electrical performance of motors.

Show More
Price: $7.50
Paper: Computer-Aided Studies of Rod Pumping System Performance
Paper: Computer-Aided Studies of Rod Pumping System Performance
Price
$7.50
Computerized Automation Of Oilfield Production Operations An Extensive Five-Year Study Into The Costs Benefits
Presenters: W.A. Jentsch Jr., Sun E&P Co. & R.D. Marrs, Shell Western E&P Inc.

Sun Exploration and Production Company (Sun) conducted an extensive five-year study into the costs and benefits of installing and operating a Supervisory Control and Data Acquisition (SCADA) system. Installed on the Southeast Levelland Unit (SELU), the SCADA system was operated as a full monitoring system. The SELU is a secondary recovery unit located in the Levelland Field in Hockley County, Texas. The five-year period included 30 months prior to the initial operation and 24 months following full operation of the system. One hundred thirty-four producing wells comprised the data base analyzed in the study. Through the capabilities of the system, Sun's personnel were able to reduce operating costs significantly in several areas. Reduction in subsurface failures per barrel of fluid lifted was 28.6%, and in power consumption per barrel of fluid lifted was 11.3%. An increase in oil and gas production ranging from 3.8% to 13.9% was realized. Actual and potential intangible benefits were also identified. All factors which could significantly influence the determination of the tangible benefits' true value were identified and considered. The factors considered were drilling effects, workover effects, percent water cut increase, increased water production per well, increased water injection, injection to withdrawal ratio (I/W), rod and tubing life, and the chemical program. This paper briefly outlines the Unit operations and the SCADA system installation, explains in detail the five-year study, and highlights other intangible benefits provided by the system.

Show More
Price: $7.50
Paper: Computerized Automation Of Oilfield Production Operations An Extensive Five-Year Study Into The Costs Benefits
Paper: Computerized Automation Of Oilfield Production Operations An Extensive Five-Year Study Into The Costs Benefits
Price
$7.50
Computerized Gas Lift Design A New Field Tool
Presenters: Sidney S. Smith, Camco, Inc.

Computer programs have been perfected for the design of continuous flow and intermittent gas lift installations. Calculations can be performed for all standard designs, for macaroni and annular flow installations, and for wells where wireline retrievable valve-mandrels were previously installed. Using the same well data, the computer calculates installation designs which duplicate accurate hand calculations using the same graphical procedure. The resulting printout provides a complete permanent report of all information pertinent to the design. This includes all the well data submitted, intermediate calculated results and the final design.

Show More
Price: $7.50
Paper: Computerized Gas Lift Design A New Field Tool
Paper: Computerized Gas Lift Design A New Field Tool
Price
$7.50
Concentric Coiled Tubing Jet Pump Installation in Ezzaouia 8, Tunisia
Presenters: Lee Nirider & Keith Fangmeier, Marathon Oil Company; Tarek Ben Rhouma, Maretap Oil Company; William Coleman, Coleman Pump Company

Marathon's Ezzaouia #8 well is located in the Ezzaouia concession in the Zarzis permit area of Eastern Tunisia. The well is completed as an oil producer in a 7300" Jurassic sandstone and has never sustained steady production with the existing 3-l/2" tubing. Systems analysis suggest that the well could flow, at least temporarily, with smaller tubing or could sustain production for a much longer time with artificial lift. Installation of a rod pumping system would be an easy decision in most parts of the world, but due to a lack of workover rigs in Tunisia a rod pumping system was not selected. Furthermore, the Jurassic reservoir is a depletion drive reservoir with a extremely limited water drive and thus was not a candidate for gas lift with wireline retrievable gas lift valves.. However, an innovative artificial lift approach utilizing a coiled tubing unit, 1.50" OD coiled tubing and a casing free hydraulic jet pump was selected for producing the well. See Table 1 for additional data on Ezzaouia #8.

Show More
Price: $7.50
Paper: Concentric Coiled Tubing Jet Pump Installation in Ezzaouia 8, Tunisia
Paper: Concentric Coiled Tubing Jet Pump Installation in Ezzaouia 8, Tunisia
Price
$7.50
Concepts of Continuous-Rod Pumping
Presenters: L. Douglas Patton, Pool Products & Systems

The concept of continuous-rod pumping is nearly as old as the rod pumping system itself. However, there was a Three-fold problem with the concept. First of all, there was a problem of manufacturing the continuous-rod and finding a suitable means of heat-treating the rod. Secondly, after the rods had been welded together to the specified length for a given well, there was the question of transporting the rod string to the well. And finally, there was the difficulty of handling the continuous-rod in running and pulling the rod string in the well. The solution to this three-fold problem has been resolved, and the concept of the continuous- rod pumping system is now a reality.

Show More
Price: $7.50
Paper: Concepts of Continuous-Rod Pumping
Paper: Concepts of Continuous-Rod Pumping
Price
$7.50
Conformance Control in Oil Recovery
Presenters: Dwyann Dalrymple, David Sutton, and Prentice Creel Halliburton Services

Once primary oil recovery from a reservoir has been accomplished, secondary and enhanced oil recovery techniques have been used to further the life of the field. Some of the most commonly occurring problems encountered with these techniques are: 1. Lack of confinement to the section of interest 2. Permeability variations in the producing zone 3. Early water breakthrough due to fingering of the injection fluid through
the oil 4. Directional permeability from injection wells to producers

Show More
Price: $7.50
Paper: Conformance Control in Oil Recovery
Paper: Conformance Control in Oil Recovery
Price
$7.50
CONFORMANCE-IMPROVEMENT-TREATMENT DESIGN AND IMPLEMENTATION STRATEGIES TO MAXIMIZE PERFORMANCE -- BASED ON 20 YEARS EXPERIENCE WITH A SINGLE POLYMER-GEL TECHNOLOGY
Presenters: Robert D. Sydansk, Sydansk Consulting Services, LLC

Design and implementation strategies for maximizing the economic rate of return for conformance-improvement polymer-gel treatments will be reviewed. These design and implementation strategies are based on 20 years of field experience and based on number of large field projects involving a single polymer-gel technology. The presentation will be limited to discussing gel treatments that are applied to reservoirs suffering from fracture and/or other high-permeability (>2 Darcy) reservoir flow anomalies. Strategies both for injection-well sweep-improvement gel treatments (primarily intended to generate incremental oil production) and for production-well water-shutoff gel treatments (primarily intended to reduce OPEX) will be discussed. Special attention will be paid to the volume sizing of such gel treatments. In addition, the often overlooked economically promising use of polymer-gel conformance-improvement treatments during CO2 oil-recovery flooding operations will be touched upon.

Show More
Price: $7.50
Paper: CONFORMANCE-IMPROVEMENT-TREATMENT DESIGN AND IMPLEMENTATION STRATEGIES TO MAXIMIZE PERFORMANCE -- BASED ON 20 YEARS EXPERIENCE WITH A SINGLE POLYMER-GEL TECHNOLOGY
Paper: CONFORMANCE-IMPROVEMENT-TREATMENT DESIGN AND IMPLEMENTATION STRATEGIES TO MAXIMIZE PERFORMANCE -- BASED ON 20 YEARS EXPERIENCE WITH A SINGLE POLYMER-GEL TECHNOLOGY
Price
$7.50
Conroe Automation Project
Presenters: Don Alexander, Getty Oil Co.

The Conroe Field contains 959 wells which produce primarily from the Cockfield and Main Conroe Sands. The Main Conroe Sand, encountered at about 5000 ft, yields an average oil production of 35,000 BPD. This field was discovered in 1932 and has a remaining life expectancy of more than 25 years. About 60 percent of the total wells are on gas lift. Gas production from the Cockfield zone plus oilwell residue gas from the Main Conroe Sand supply most of the gas lift gas. Two gasoline plants in the field gather the low pressure residue gas. Within the field, Getty Oil operates 10 leases that contain a total of 68 oil wells and 14 gas wells. In 1964, three ACT units were installed to serve all of these leases. During this first phase of modernization, tank storage and gauging were eliminated from each lease; but treating and separation facilities remained essentially unchanged. In 1968, the second phase of this program was commenced to modernize existing facilities and install supervisory control equipment. This paper discusses how Getty Oil automated these leases under digital computer control. Figure 1 is a map of the Conroe Field which shows the leases automated and the location of all battery sites, remote terminal units and ACT units.

Show More
Price: $7.50
Paper: Conroe Automation Project
Paper: Conroe Automation Project
Price
$7.50
Conservation and Recovery Methods of Stock Tank Vapors
Presenters: A.W. Tweelings, Hy-Bon Engineering Co., Inc.

Oil may be lost from a tank in the gas or vapor phase form, a phenomenon which is known as evaporation loss. The evaporation loss to the atmosphere from lease tank batteries is a definite loss of our natural resources. The question, is this evaporation loss great enough to have any monetary value at the present time? Are there economical methods for recovering these vapor losses and are such methods profitable to oil producing operations? To these questions the answer is definitely yes, in lieu of the expansion of Gasoline Plants, Product Pipelines and the Petro-Chemical Plants in the West Texas

Show More
Price: $7.50
Paper: Conservation and Recovery Methods of Stock Tank Vapors
Paper: Conservation and Recovery Methods of Stock Tank Vapors
Price
$7.50
Conservation With Stock Tank Vapor Recovery
Presenters: Ralph Nelson, Hy-bon Engineering Company, Inc.

Efficiency of primary and secondary oil recovery has become a major economic requirement for all crude oil producers. The phase of crude oil production this paper will consider is final gas-oil separation with the stock or surge tank and recovery of the resultant vapor. A basis for consideration of stock tank vapor recovery will require a gas sales outlet at a centralized location where crude oil is treated for pipeline sale or storage. The loss of tank vapor to atmosphere is familiar to most production personnel; thus, with the current trend of lease custody transfer and/or tank battery consolidation, the volume of vapor loss becomes a factor worthy of consideration.

Show More
Price: $7.50
Paper: Conservation With Stock Tank Vapor Recovery
Paper: Conservation With Stock Tank Vapor Recovery
Price
$7.50
Conservation With Vapor Recovery
Presenters: Ralph Nelson, Hy-bon Engineering Co.

This paper demonstrates the design and application of vapor recovery systems, including treating systems for boosting recovered liquids into plant line, crude stabilization, well casing pressure control, battery systems, and casing vapor recovery systems.

Show More
Price: $7.50
Paper: Conservation With Vapor Recovery
Paper: Conservation With Vapor Recovery
Price
$7.50
Consideration of Retrograde Loss in Determining the Optimum Economic Operation of a Gas Condensate Reservoir
Presenters: Philip L. Moses, Core Labs, Inc

Most so-called gas reservoirs which produce liquid in the ratio of ten barrels per million or more are actually retrograde condensate reservoirs. As retrograde condensate reservoirs, they exhibit a dew point and condense liquid in the formation upon reduction in reservoir pressure. This liquid condensation in the reservoir adversely affects the production of liquid and gas at the surface. In extreme cases this retrograde condensation in the reservoir may result in the loss of as much as 75 to 80 per cent of the stock tank condensate initially contained in the reservoir fluid. With a knowledge of how the producing well stream characteristics may be expected to behave as reservoir pressure declines, several alternatives are available to minimize the effect of this retrograde loss. The decisions to be made are largely economic decisions based upon an accurate projection of both gas and condensate production over the life of the reservoir for various operating methods. This paper describes the type of study needed on the reservoir fluid to make intelligent decisions regarding the method of operation of the reserve, including decisions regarding the method of operation of the reserve, including decisions regarding the pressure maintenance versus pressure depletion and choice of surface separation equipment. In addition, the data are furnished to calculate the economics of gasoline plant operation considering either pressure maintenance or pressure depletion with lease separation of full well stream processing. With proper data, the reserve may be operated to obtain the maximum economic return.

Show More
Price: $7.50
Paper: Consideration of Retrograde Loss in Determining the Optimum Economic Operation of a Gas Condensate Reservoir
Paper: Consideration of Retrograde Loss in Determining the Optimum Economic Operation of a Gas Condensate Reservoir
Price
$7.50
Considerations for Designing Workover Operations With Continuous Coiled Tubing
Presenters: Angus S. McReynolds, NOWSCO Services

The use of continuous coiled tubing to perform various types of remedial treatments or workovers has been well documented.1~2*3~4 Numerous successful treatments have been obtained with this device in oil, gas, injection and geothermal wells. However, the occurrence of and, more importantly, the causes of failures in operations involving coiled tubing have not been addressed by the industry. An examination of causes of failure should lead to a higher success ratio.

Show More
Price: $7.50
Paper: Considerations for Designing Workover Operations With Continuous Coiled Tubing
Paper: Considerations for Designing Workover Operations With Continuous Coiled Tubing
Price
$7.50

Annual Conference Info

NEXT CONFERENCE: APRIL 21-24, 2025