Tracing Techniques Utilizing Radioactive Isotopes
Presenters: Tom G. Calhoun, II, Calhoun Engineering

Major advances in the measurement of extremely small amounts of radiation make the use of radioactive isotopes as a tracing material in petroleum reservoirs practical. Isotopes, Inc. has developed equipment capable of extremely low level techniques which, together with a number of low cost radioactive isotopes, make possible many useful applications in reservoir engineering. By introducing radioisotopes in the injection wells with the injected fluids it is possible to "tag" the injected fluid and, by analyzing produced water or gas, to trace the movement of the injected fluid throughout the reservoir. Directional permeability may be identified early in the lift of the project so that steps can be taken to maximize recovery efficiency.

Show More
Price: $7.50
Paper: Tracing Techniques Utilizing Radioactive Isotopes
Paper: Tracing Techniques Utilizing Radioactive Isotopes
Price
$7.50
TRAINING STANDARDS - BASIC ROD PUMP DESIGN AND THE EFFECTS OF TAGGING
Presenters: Larry Hambreck, Robert Hillger and Albert Garza, Pioneer Natural Resources; Charlie Burdette and Rodney Sands, Harbison-Fischer; Johnny Bunsen, Tommy White Supply

With the exponential growth that our industry has experienced, Pioneer Natural Resources needed additional training for their new hires concerning basic rod pump design and how the rod pump works in a normal pumping system. With PNR's vendor base, pumpers, technicians and management, we worked together to develop this training presentation. Our discussions lead us to the issue of tagging wells and the effects it has on the entire pumping system. This team realized that this school would be beneficial to all field employees, not just new hires.

Show More
Price: $7.50
Paper: TRAINING STANDARDS - BASIC ROD PUMP DESIGN AND THE EFFECTS OF TAGGING
Paper: TRAINING STANDARDS - BASIC ROD PUMP DESIGN AND THE EFFECTS OF TAGGING
Price
$7.50
TrainingTroubleshooting Guide For Plunger Systems
Presenters: Dan Phillips & Scott Listiak, Conoco Inc.

Plunger lift has become a very popular and economical artificial lift alternative, especially in high GLR gas and oil wells. Success in plunger lift systems depends on proper candidate identification, good wellbore mechanical integrity, and the effectiveness of the production or lease operator. This paper will focus on the production operator, and describe the basic principles necessary for effective training and the sound operation of a plunger lift system. In many instances the plunger controller is the main focus of training. However, a clear understanding of why a plunger system is needed, the proper operating parameters, and the relationship of IPR curves and unloading rates are more important to effective operator training. If an operator does not clearly understand these principles, a plunger system is unlikely to be operated at peak efficiency. Knowing how a gas well loads up, what options exist to remedy this problem, and what the remedies actually accomplish are necessary to maximize efficiency and profits. This paper describes foundational principles required to understand and operate a plunger lift system, and explains some common misconceptions. Also included are a description of plunger parts that need to be maintained, a parts "survival kit", a description of some common problems to plunger operation, and a basic trouble-shooting chart. With this information an operator will be able to keep a plunger system running efficiently in order to maximize well production.

Show More
Price: $7.50
Paper: TrainingTroubleshooting Guide For Plunger Systems
Paper: TrainingTroubleshooting Guide For Plunger Systems
Price
$7.50
Transient Pressure Interpretation In A Deep Delaware Basin Gas Well
Presenters: John Munroe & J.W. Spencer II, Gulf Oil E&P Co.

As the search for new gas supplies intensifies, deeper reservoirs are being investigated. The following describes the design, testing, and difficulties encountered in transient pressure analysis in a high pressure, low permeability gas well. The conclusions drawn from the test will also be discussed. Transient pressure testing was selected as the most timely method to describe the reservoir. The pseudo-pressure technique was applied to the data obtained. The subject well, Emma Lou Gas Unit 1, Well No. 1, was completed from 22,156 ft to 22,240 ft in the Puckett West Bend Field, Pecos County, Texas. The initial reservoir pressure was greater than 18,000 psi, and the reservoir temperature was in excess of 360 F. Due to the pressure and temperature in this well being beyond any empirical relationships, the compressibility and viscosity data were obtained from, the Peng Robinson Equation of State. All test data was gathered at the wellhead, and the bottom-hole conditions were calculated from the Cullender and Smith Sandface Pressure Method. Due to a rapid decline in pressure, a multi-rate test was initiated. No conclusive evidence of a reservoir boundary was seen during the testing. However, due to the low kh and deliverability, additional drilling was not undertaken. Even though the test was performed in a limited time and without laboratory analysis of fluid and formation properties, well performance to date has supported the reservoir description from the drawdown and multi-rate tests.

Show More
Price: $7.50
Paper: Transient Pressure Interpretation In A Deep Delaware Basin Gas Well
Paper: Transient Pressure Interpretation In A Deep Delaware Basin Gas Well
Price
$7.50
Treaters Will Work
Presenters: Loren E. Wood, Black, Sivalls & Bryson, Inc.

Treating is simply a procedure that has been devised to separate crude oil from the water and foreign material produced from the reservoir. In treating a wellstream, the treater "breaks" the emulsion and separates the oil from the water, sand, and other sediment produced with it.

Show More
Price: $7.50
Paper: Treaters Will Work
Paper: Treaters Will Work
Price
$7.50
Treating Oil With A Wrist Watch
Presenters: D.J. Foster, Tretolite Company

Two simple aids for improving emulsion treatment of crude systems are presented.

Show More
Price: $7.50
Paper: Treating Oil With A Wrist Watch
Paper: Treating Oil With A Wrist Watch
Price
$7.50
Treating Water for Water Floods
Presenters: Wayland C. Martin, Treat-Rite Water Laboratories

The purpose of this paper is to give a general report of water treatment as it applies to secondary oil recovery by water repressuring. It is not meant to be technical but rather informative, explaining the general considerations to be given to the treatment of water. It is also meant to assist in coordinating the efforts of the different departments involved in the planning and operation of a water treating system.

Show More
Price: $7.50
Paper: Treating Water for Water Floods
Paper: Treating Water for Water Floods
Price
$7.50
Treatment of Crude Oil Emulsions
Presenters: Bill K. DuBois, Aquaness Department, Atlas Powder Company

This paper presents the theory of emulsions, mechanics that usually create them and methods of emulsions, mechanics that usually create them and methods of emulsion treatment, including treating systems. The ability of iron sulfide to stabilize emulsions is also discussed, as well as a technique for iron sulphide removal from treating systems and equipment.

Show More
Price: $7.50
Paper: Treatment of Crude Oil Emulsions
Paper: Treatment of Crude Oil Emulsions
Price
$7.50
Treatment of Problem Formations In The Permian Basin
Presenters: Richard L. Royal, Dow Chemical Company

Knowledge of rock properties can be valuable tool in designing treatments for problem formations. All formations in the Permian Basin could be considered problem formations, but only the Delaware, San Andres, and Wolfcamp are discussed here. These rocks are of particular interest because of recent findings in core analysis and Scanning Electron Microscope (SEM) studies. The characteristics of these formations revealed by these studies have provided clues for improving treatment techniques. The new techniques are providing productivity increase many times greater than conventional treatment techniques. This paper describes the studies of the three formations, the results of the studies, and the use of these results in the design of improved treatment techniques. Field results are used to support the success of improved treatment design in providing greater production increases.

Show More
Price: $7.50
Paper: Treatment of Problem Formations In The Permian Basin
Paper: Treatment of Problem Formations In The Permian Basin
Price
$7.50
Treatment of Water for Subsurface Injection
Presenters: Wallace J. Frank, Humble Oil & Refining Co.

The basic practices to consider in the design, operation and maintenance of subsurface injection using a closed type system are discussed. Factors influencing the quality of water, methods of testing, and procedures to improve or maintain the quality of water desired are given.

Show More
Price: $7.50
Paper: Treatment of Water for Subsurface Injection
Paper: Treatment of Water for Subsurface Injection
Price
$7.50
Troubleshooting Oil-Water Separators By Measuring Their Residence-Time Distribution
Presenters: B. Zemel, Shell Development Co. & W.D. Burton, Shell Oil Co.

Separation of oil and water (particularly the separation of small volumes of oil from large volumes of water) is a problem of increasing importance to the oil industry. The economics of handling large volumes of fluids often dictates the use of simple gravity-type separators for most of these separations. So long as the separators fulfill their function, there is little concern about flow characteristics, but when they fail in this function, normal oilfield practice is either to increase chemical, to add additional capacity, or to use some combination of both. It is often true, however, that the fault is due not to inadequate capacity or improper treatment, but is due rather to poor hydraulic characteristic of the separator. The only feasible method for determining the flowcharacteristics of a continuous separator is by the use of a tracer technique. The presence of such phenomena as short circuiting, the existence of stagnant flow regions, the presence of high rates of mixing and dispersion in the vessel, and other such hydrodynamic ills are easily identified by use of the tracer-response technique. Measurements can be made during the operation of the separator without interfering with it in any way, and thus measurements can be used to check the effect of variations in any of the operating parameters of the system. The causes of such hydrodynamic problems are numerous. They are rarely obvious from superficial examination of the system and, in our experience, are the rule rather than the exception. Plug flow is a very rare phenomenon in oil-field separators. Poor hydraulic characteristics of a separator can result in inadequate capacity, if a substantial fraction of the fluids spend insufficient time in the separator due to poor flow paths. Poor hydraulic characteristics may also contribute to poor treatment efficiency by introducing shear forces which decrease the droplet sizes and make separation more difficult for the same time interval. In this paper, the procedures required to make such measurements in the field are discussed, and the details of a successful method are described. Some of the results obtained in field measurements will be shown and the results discussed in terms of the hydraulic characteristics of the separators.

Show More
Price: $7.50
Paper: Troubleshooting Oil-Water Separators By Measuring Their Residence-Time Distribution
Paper: Troubleshooting Oil-Water Separators By Measuring Their Residence-Time Distribution
Price
$7.50
True Intelligence At The Wellsite
Presenters: Mike Poythress, eProduction Solutions

Although the expression only used today, many times it seems the may not be g well operations. This paper will review the features and benefits of a built-in Flux Vector Drive for Beam Pumping. The Flux Vector Technology incorporated in this controller is different from an off-the-shelf Variable Frequency Drives in that it is designed and built for Oil Field Applications and includes application specific software and firmware, which provides the operator with a unique tool that brings a new meaning to te Intelligence. This to control the speed of the pumping unit in each direction of every stroke - in order to meet a pre described pump fill target. The drive also controls rod-force, by slowing or stopping the unit when a predetermined minimum or maximum rod stress is reached. A bridle separation limiter prevents rod float by automatically adjusting the down stroke speed. The gearbox ratio calculator automatically computes the overall ratio between the motor and crankshaft throughout each pump stroke. These features, along with many others included in this Flux Vector Drive, will be reviewed in this paper and case histories will detail actual benefits to the operator.

Show More
Price: $7.50
Paper: True Intelligence At The Wellsite
Paper: True Intelligence At The Wellsite
Price
$7.50
Tubing Anchor Catcher Applications and Operation
Presenters: Ricky Roderick and Jyothi Swaroop Samayamantula, Don-Nan Pump & Supply

From the selection process to installation and continued maintenance, the Tubing Anchor Catcher (TAC) is one of the most important tools in achieving efficient pumping operation.

Show More
Price: $7.50
Paper: Tubing Anchor Catcher Applications and Operation
Paper: Tubing Anchor Catcher Applications and Operation
Price
$7.50
Tubing Anchors -- Should We Use Them
Presenters: Joe Chastain, Manufacturer's Agent

Is your company likely to have worn tubing couplings or holes worn in the casing caused by tubing movement in the next few years? Are the tubing threads or even the body of the tubing likely to break by repeated stresses of transfer load? Do you think that there is likely to be a loss of efficiency in pumping due to movement of the tubing at the pump end? Could it be possible that low pump efficiency could be due to the leaky thread in the tubing, resulting from the tubing threads working? If the answer is "Yes," then it is entirely possible that you should use tubing anchors.

Show More
Price: $7.50
Paper: Tubing Anchors -- Should We Use Them
Paper: Tubing Anchors -- Should We Use Them
Price
$7.50
Tubing and Casing Repair With Plastic Liners
Presenters: George King, BP Americas Inc., & Rob Wesson & Jack Vloedman, Enerline Inc.

The goal of the work in lining tubing is to be able to place a liner or velocity string, without necessity of a conventional rig, into a well with minimum time disruption to production This paper discusses the application techniques and history of in-place repair of downhole casing and tubing. Over 230 wells have been lined with plastic and several plastic velocity/siphon strings have been installed. Technology development is necessary to extend the plastic lining techniques to deeper and hotter wells. Plastic well lining is discussed and successes and limitations are explored.

Show More
Price: $7.50
Paper: Tubing and Casing Repair With Plastic Liners
Paper: Tubing and Casing Repair With Plastic Liners
Price
$7.50
Tubing Clean-Out Studies with an Environmentally Safe Pickling Fluid
Presenters: Sandra L. Berry and Joel L. Boles, BJ Services Company

A slightly, acidic (pH of 5.8-6.3) Tubing Clean-Out Fluid has been evaluated in the laboratory and in the field for use as a pickling fluid to replace the traditional acids. This fluid's capability to remove iron scales on coiled tubing, prevent or delay rust from reforming, clean up commercial pipe dopes and reduce corrosion rates, was compared to traditional hydrochloric acid in laboratory studies. This fluid performed as efficiently as 15 wt% hydrochloric acid at 140_F in removing rust/iron scale as well as pipe dope from the workstring with lower corrosion rates at typical bottom hole temperatures. Furthermore, a work string treated with this fluid retained a protective coating that resisted re-oxidization for up to 30 days. Also, several case histories detailing the product's field use for pickling completion workstring are discussed.

Show More
Price: $7.50
Paper: Tubing Clean-Out Studies with an Environmentally Safe Pickling Fluid
Paper: Tubing Clean-Out Studies with an Environmentally Safe Pickling Fluid
Price
$7.50
Tubing Joints for Running Independent Strings in Dual Wells
Presenters: J.B. Gillham, Hydril Company

The purpose of this paper is to outline the types of tubing joints and combinations of tubing that are considered satisfactory for use in dual wells, completed with two or more independently hung tubing strings. Field experience in running two or more independent strings of tubing has indicated certain running clearance requirements. The clearance can be calculated for the various dual well conditions. Many of these combinations are shown on clearance charts. The use of two or more tubing strings in dual wells appears to offer many advantages for rod pumping, hydraulic and for gas lift systems or combinations of any two of these methods.

Show More
Price: $7.50
Paper: Tubing Joints for Running Independent Strings in Dual Wells
Paper: Tubing Joints for Running Independent Strings in Dual Wells
Price
$7.50
Tubing Movement and Tubing Anchor Payout in Pumping Wells
Presenters: J.L. Logan, Baker Oil Tools, Inc.

The bottom of a string of unanchored tubing in a rod-pumped well moves up on the upstroke of the sucker rods and down on the down-stroke. The lower portion of the tubing string also buckles around the rods as they move up and goes straight as they start back down. Both vertical movement and buckling are caused primarily by those well pressures to which the tubing string is exposed. Decreased pump efficiency and abnormal rod, tubing, pump and casing wear are some of the detrimental results of this movement and buckling. Several past publications explain how a tubing anchor stops movement and keeps the tubing straight but none show how much this movement, which is actually the loss in pump stroke, might be. This paper first reviews the theories related to movement of the bottom of a string of freely hanging tubing in a pumping well and presents equations for calculating its amount. It then shows how a tubing anchor can be justified through increased production brought about by increased pump efficiency. Knowing the amount of cyclical movement will also give some indication of the reasons for excessive downhole wear. The paper also describes the various types of tubing anchors and includes some actual field cases which verify the advantages of anchoring tubing in rod-pumped wells.

Show More
Price: $7.50
Paper: Tubing Movement and Tubing Anchor Payout in Pumping Wells
Paper: Tubing Movement and Tubing Anchor Payout in Pumping Wells
Price
$7.50
Tubing-Conveyed, High-Temperature, Deep Well Perforating
Presenters: Roy R. Vann, Sr. & Ray Owens, Vann Tool Company

Previous research and publications have established that clear and effective communication between the casing and the reservoir formation is an absolute requirement for an effective oil or gas well completion." As wells are drilled deeper and casing strings become smaller, the ability of jet perforating guns to penetrate the well bore effectively is greatly reduced. In wells exceeding l&000-foot depths one or more of the following situations usually exist: 1. Combination casing strings involving small bottomhole ID 2. The necessity of using small perforating guns due to well design 3. High compressive strength rocks which decrease the penetration of jet guns 4. High bottomhole temperatures which can reduce the penetrating effectiveness or performance of the perforating gun and in some cases render it inoperable 5. Excessive completion costs due to items 1 through 4. Because of these factors, the completion of such wells successfully, safely, economically, and satisfactorily has become an ever-increasing challenge. Present completion techniques of perforating usually employ the use of a shallow penetrating jet perforating gun run on wire line. When penetration is not sufficient, hydraulic treatment is needed to complete the well. Hydraulic treatment can be costly, and in some instances, possibly damage the production zone. In a unique modification of its field-tested and proven TUBING CONVEYED Perforating Technique, Vann Tool Company has devised what is believed to be a safe, effective means of perforating deep, high-pressure wells with abnormally high bottomhole temperatures. This method is called the VANNTAGE High Temperature TUBING CONVEYED Perforating System. It is now ready for field testing.

Show More
Price: $7.50
Paper: Tubing-Conveyed, High-Temperature, Deep Well Perforating
Paper: Tubing-Conveyed, High-Temperature, Deep Well Perforating
Price
$7.50
Tubingless Completions
Presenters: W. Van Winkle, Baker Oil Tools, Inc

This paper presents an up-to-date evaluation of practices and problems encountered in the use of "small diameter completions."

Show More
Price: $7.50
Paper: Tubingless Completions
Paper: Tubingless Completions
Price
$7.50
Tubingless Completions
Presenters: Robert A. Kent, Baker Oil Tools, Inc.

As the result of a rapidly expanding backlog of experience and knowledge, more and more operators are viewing tubingless completions as a practical and entirely feasible means of completing wells.

Show More
Price: $7.50
Paper: Tubingless Completions
Paper: Tubingless Completions
Price
$7.50
Tubingless PCP Applications For Slimhole Wells
Presenters: Norman Hein Jr., Rick Himbury, & James A. Brieden, Conoco Inc. & Rick Adair, Paradigm Lift Technologies LLC

The Sacatosa field is located in Maverick County, approximately 19 miles East of Eagle Pass, Texas. Production has been mainly limited to the San Miguel -1 reservoir. Conoco discovered this sandstone formation (1 135 to 1768 feet deep) in December 1956. Production wells were typically drilled using one string of 4 %-inch, J55, 9.5 lb./ft. casing. Completion practices typically did not always cement back to the surface. After many years of service, well casings have failed. It has been common practice to extend the productive life of these wells by cementing in 3-inch or 2 7/8-inch liners. However, 1.9- inch tubing is then required to run insert sucker rod pumps. Because of the thin wall thickness of this pipe, there have been numerous tubing failures. Additionally, approximately 10 years after running a liner, a well typically starts to have liner problems. A unique application of the progressing cavity pump (PCP) technology was tried in a pilot well by running this equipment without tubing. After the first success, three other installations were tried. This paper will discuss these installations and provide further discussion on the application of PCP technology to other wells.

Show More
Price: $7.50
Paper: Tubingless PCP Applications For Slimhole Wells
Paper: Tubingless PCP Applications For Slimhole Wells
Price
$7.50
Turnkey Waterflood Installation
Presenters: Eugene E. Campbell, Mid-Continent Supply Co.

The design and installation of a turnkey waterflood, the Yan-Kee (Canyon) Field waterflood, is presented.

Show More
Price: $7.50
Paper: Turnkey Waterflood Installation
Paper: Turnkey Waterflood Installation
Price
$7.50
Two Devices For Improving The Thermal Efficiency Of Fired Equipment
Presenters: W.P. Manning & G.W. Sams, C-E NATCO R&D

It would be nice if elemental carbon and hydrogen could be burned and the entire heat of combustion could be obtained. But, handling raw elements is difficult, and hydrocarbons are by far the most available and convenient fuels. This means that the heat of formation of the hydrocarbon is lost. Fortunately, the heat of formation of fuel oils and natural gases is relatively small, e.g. 3 to 8 percent of the heat released. Combustion of hydrocarbons is complicated by the fact that the water produced may or may not be considered to be condensed. This is the difference between the higher (water condensed) and lower (water not condensed) heating values (HHV and LHV). In calculations of thermal efficiency, the heat obtained by condensing the water vapor may or may not be considered to be available. This is the difference between the gross (heat available) and net (heat not available) thermal efficiencies (GTE and NTE). The HHV and NTE are the more widely used terms, simply because they are higher values. These terms are used throughout this paper even though the respective bases are inconsistent. Figure 1 shows the NTE for burning natural gas (HHV of 1000 Btu/scf) in terms of the stack gas temperature and the excess air, which are the two parameters by which the performance of fired process equipment can be measured. The break in the curves at 100-130 F corresponds to the condensation of the water vapor produced during combustion. Above 135 F, the vapor pressure of water is greater than its partial pressure and condensation cannot occur. The NTE decreases with increasing stack gas temperature and the departure from linearity represents the change in the specific heat of the combustion gases with temperature. Below 135 F, the vapor pressure of the water vapor is less than the partial pressure and condensation occurs until it is essentially complete at 60 F. This corresponds to a GTE of 100 percent or a NTE of 111 percent. An efficiency over 100 percent means that heat is recovered which is not considered by the calculation procedure to be available. The decrease in the NTE with increasing excess air is the result of increased sensible heat losses in the stack gases. About 10 percent excess air is needed for complete combustion of the fuel. Any additional air acts as a diluent. It reduces the flame temperature and the heat-transfer rate in the firetube and increases the amount of stack gases. Methods for improving the NTE can be analyzed conveniently according to the function involved, that is, control of the excess air and recovery of more sensible heat from the stack gases.

Show More
Price: $7.50
Paper: Two Devices For Improving The Thermal Efficiency Of Fired Equipment
Paper: Two Devices For Improving The Thermal Efficiency Of Fired Equipment
Price
$7.50
Two Piece Plunger Test Results
Presenters: Garg Divyakumar, Joe McInerney, James Lea and Paulus Adisoemarta, Texas Tech University

The two piece plunger (a steel ball below and a hollow cylinder above) lifts liquids when the pieces are together and on reaching the surface the ball falls and the cylinder falls when a short shut-in period occurs. There are many instances where using this plunger results in production increases. However in some cases, it appears to have a lesser effect. Results of testing show that above certain rates, the components will not fall in the well. Test results, and the result of drag models to fit the test data are extended to show the potential user what the maximum allowable rates are from the well, before the individual components are predicted to be unable to fall in the well, thereby making application impossible without a temporary reduction in the flow rate. The results should allow the user to be able to better use the two piece plunger in a wider range of application conditions.

Show More
Price: $7.50
Paper: Two Piece Plunger Test Results
Paper: Two Piece Plunger Test Results
Price
$7.50

Annual Conference Info

NEXT CONFERENCE: APRIL 21-24, 2025