Paper: Well Depositions Formation, Removal Prevention

Paper: Well Depositions Formation, Removal Prevention
Price
$7.50
Variations
Abstract

Well Depositions Formation, Removal Prevention

Presenters

J.C. Trainer & Gene Mancillas, Byron Jackson, Inc.

In as much as those attending mar not be too familiar with the design and operation of a gas turbine, it would appear that a brief introduction to the unit would help the general understanding of the discussion. Having described the unit in some detail we find that the turbine lends itself to the oilfield industry primarily because it is a continuous duty unit most compatible with the continuous operation of the industry. Being air cooled, light weight, multi-fueled, simply controlled and easily packaged it is easily installed in virtually any location.

Annual Conference Info

NEXT CONFERENCE: APRIL 21-24, 2025