Paper: Plunger Leakage And Viscous Drag For Rod-Drawn Oil Well Pumps
Price
$7.50
Variations
Abstract
Plunger Leakage And Viscous Drag For Rod-Drawn Oil Well Pumps
Presenters
R. Kyle Chambliss, James Chrisitan Cox, & J.F. Lea, Texas Tech University
A new method for calculating plunger pump leakage in rod pumped wells is introduced. This method involves calculating a velocity profile for an annulus with the inner wall moving parallel to the outer wall. An average velocity is determined for the annular fluid flow, which in turn is used to calculate the fluid slippage. Eccentricity is also considered in the slippage calculation method. The results are evaluated against the historical field data and compare favorably to recent testing for smaller plunger clearances. Work remains to be done at larger clearances. A formula for calculating viscous plunger drag is also introduced.