Paper: Gas Turbines as Prime Movers for High Pressure Water Injection
Price
$7.50
Variations
Abstract
Gas Turbines as Prime Movers for High Pressure Water Injection
Presenters
J.C. Neal, Gulf Oil Corporation
Gas turbines are being utilized as the prime movers for Gulf's Goldsmith (5600-ft.) Field Water Injection Station. The Goldsmith (5600-ft.) Field is located in Ector County, Texas. This paper will endeavor to describe the installation, operation, and economics of using gas turbines as prime movers. This paper will cover a period of almost 5 years, from initial installation in April 1961 to January 1966.