Selection and Application of Prime Movers For Oil Well Pumping

Presenters

J. Taylor Hood, Lufkin Foundry & Machinery Co.

Often the oil operator fails to recognize the importance of a careful study of the prime mover, yet each well that does not flow involves a problem in the selection and application of a suitable prime mover. Many formulas have been derived to determine the prime mover size. Basically, these formulas give essentially the same results when the same allowances have been made. An overall multiplier is generally applied without much thought as to the exact factors involved. Sometimes, very important factors are overlooked in obtaining an efficient, economical prime mover installation.

Presentation Information

Annual Conference Info

NEXT CONFERENCE: APRIL 21-24, 2025