Gas Turbines as Prime Movers for High Pressure Water Injection

Presenters

J.C. Neal, Gulf Oil Corporation

Gas turbines are being utilized as the prime movers for Gulf's Goldsmith (5600-ft.) Field Water Injection Station. The Goldsmith (5600-ft.) Field is located in Ector County, Texas. This paper will endeavor to describe the installation, operation, and economics of using gas turbines as prime movers. This paper will cover a period of almost 5 years, from initial installation in April 1961 to January 1966.

Presentation Information

Annual Conference Info

NEXT CONFERENCE: APRIL 21-24, 2025