Presenters
C.J. Merryman, Sun Oil Company
Severe production penalties often result from gas interference in the operation of pumping wells. Test results of the application of field constructed bottom hole gas separator systems have proved and re-emphasized the merit of these installations. Increased pump efficiency and increased production can be obtained through the proper use of equipment that has often been referred to as inadequate and obsolete.