Presenters
Arthur R. Washburn, Axelson Manufacturing Company
The prime consideration of an operator after the pumping unit has been installed is how to obtain the longest possible operating life, the minimum amount of nonproductive time, and the lowest overall operating cost. This problem is most easily solved by an understanding of the basic operation of the unit and the requirements of maintenance.