GAS WELL DELIQUIFICATION USING C-25 C-40 PUMPING UNITS

Presenters

Cody Pye, BP America, John Roam, WZI, Inc

Higher gas prices have presented new opportunities in gas fields. An imperative issue throughout these fields is liquid loading. This paper discusses and presents results from a low rate, low cost deliquification project. Inexpensive pumping units with a small motor and pump are installed to keep water off the formation, enabling the production of gas. This is a long term solution allowing the well to produce to its economic limit in an efficient, low maintenance system.

Presentation Information

Annual Conference Info

NEXT CONFERENCE: APRIL 21-24, 2025