Extending Run Times in Deviated Wells

Presenters

Gary Abdo, R&M Energy Systems

A greater number of deviated wells are being drilled to increase production and prolong the life of a well. Many times the build rates are very high and result in a well that is very difficult to artificially produce. Designing a pumping system that will give extended run times is an important part of maximizing profits. Working with Crimson Resources in the Bakersfield, CA area and ChevronTexaco in the Eunice, NM area, R&M Energy Systems has completed several case studies. We will examine these studies, showing best practice and cost saving.

Presentation Information

Annual Conference Info

NEXT CONFERENCE: APRIL 21-24, 2025